top of page
TENNIS GARDEN WALKWAY
The Madrid Open 2021 set aen ephemeral walkway with bleachers to watch the competition.
Built with the prefabricated system of the company NUSSLI and adapted to the specific regulations OPI-91 of Madrid.
The system allows to adapt very easily to the particular requirements due to the use and to the regulations for a correct functioning.
Another advantage of the system is that it can be assembled and disassembled in less than a week.
PROJECT INFORMATION
TYPE. Ephemeral structure
YEAR. 2021
SIZE (m2). 2.188
LOCATION. Madrid.
MMO21
bottom of page